Demo workspace for Meridian Permit Advisors (fictional). All businesses, jurisdictions, permits and sources are invented for demonstration. Changes reset when the server restarts.
Signed in as Amara Okafor · Lead Permit Consultant
Verified = traceable to approved sourceAI = suggestion, needs review
Applications / PP-1003

PP-1003 · Commercial Tenant Improvement Building Permit

Brightline Builders Co. · 412 Quarry Row (client site), 412 Quarry Row, Suite 200, Alderbrook · City of Alderbrook Building Division (City of Alderbrook)

Fictional · demoInternal review

Completeness — Tenant Improvement — submittal

Checked against checklist v2, verified 2026-09-01 by Rosa Lindqvist
Verified checklist
83% of applicable items satisfied5 satisfied · 0 missing · 0 need attention · 1 undecided · 1 n/a
TI-01 Construction drawings (two sets)
Prepared and signed by a design professional licensed in Northmere.
1 linked document passed validation.
QuarryRow_ConstructionSet_A.pdf
Source requirement
“Submit two sets of construction drawings prepared and signed by a design professional licensed in the State of Northmere.”
City of Alderbrook Building DivisionCommercial Tenant Improvement Submittal Checklist · Plans and drawingsJurisdiction: City of AlderbrookEffective: 2024-07-15Last verified: 2026-09-01 by Rosa LindqvistFictional sourceOfficial source
Satisfied
TI-02 Site plan
Identifies the tenant space.
1 linked document passed validation.
QuarryRow_SitePlan.pdf
Source requirement
“a site plan identifying the tenant space”
City of Alderbrook Building DivisionCommercial Tenant Improvement Submittal Checklist · Plans and drawingsJurisdiction: City of AlderbrookEffective: 2024-07-15Last verified: 2026-09-01 by Rosa LindqvistFictional sourceOfficial source
Satisfied
TI-03 Code analysis sheet
Included with the drawing set.
1 linked document passed validation.
QuarryRow_CodeAnalysis.pdf
Source requirement
“a code analysis sheet”
City of Alderbrook Building DivisionCommercial Tenant Improvement Submittal Checklist · Plans and drawingsJurisdiction: City of AlderbrookEffective: 2024-07-15Last verified: 2026-09-01 by Rosa LindqvistFictional sourceOfficial source
Satisfied
TI-04 Contractor's state license
Copy of the contractor's current state license.
1 linked document passed validation.
Brightline_StateLicense.pdf · exp. 2027-05-20
Source requirement
“a copy of the contractor's current state license”
City of Alderbrook Building DivisionCommercial Tenant Improvement Submittal Checklist · Supporting documentsJurisdiction: City of AlderbrookEffective: 2024-07-15Last verified: 2026-09-01 by Rosa LindqvistFictional sourceOfficial source
Satisfied
TI-05 Owner authorization letterConditional
Required if the applicant is not the property owner.
1 linked document passed validation.
Owner_Authorization_QuarryRow.pdf
Source requirement
“a letter of authorization from the property owner if the applicant is not the owner”
City of Alderbrook Building DivisionCommercial Tenant Improvement Submittal Checklist · Supporting documentsJurisdiction: City of AlderbrookEffective: 2024-07-15Last verified: 2026-09-01 by Rosa LindqvistFictional sourceOfficial source
Satisfied
TI-06 Energy compliance formsConditional
For any lighting or mechanical alterations.
Conditional item — record whether it applies, or link a document.
Source requirement
“completed energy compliance forms for any lighting or mechanical alterations”
City of Alderbrook Building DivisionCommercial Tenant Improvement Submittal Checklist · Supporting documentsJurisdiction: City of AlderbrookEffective: 2024-07-15Last verified: 2026-09-01 by Rosa LindqvistFictional sourceOfficial source
Applicability not decided
TI-07 Structural calculationsConditional
Stamped by a licensed engineer, where structural elements are affected.
Marked not applicable. — Devin Park: Engineer letter on file: no structural elements affected.
Source requirement
“Where the alteration affects structural elements, structural calculations stamped by a licensed engineer are required.”
City of Alderbrook Building DivisionCommercial Tenant Improvement Submittal Checklist · Structural workJurisdiction: City of AlderbrookEffective: 2024-07-15Last verified: 2026-09-01 by Rosa LindqvistFictional sourceOfficial source
Not applicable

Upload a document

Stored in Amazon S3 (SSE-KMS)
Enter the date printed on the document. PermitPath does not infer it.

Activity & audit trail

Full log
Lead consultantDevin Park
Authority reference—
Submitted—

AI application summary

AI-generated

Summarize outstanding requirements, recorded dates and open tasks for a client update.

Recorded dates

Client-requested submission datein 4d
2026-10-24Entered by user
Record a date
PermitPath doesn’t calculate regulatory deadlines. Record the date exactly as the authority states it.
Confirm whether lighting scope triggers energy compliance forms
Devin Parkdue 2026-10-21OpenTI-06