Checklists / Permanent Sign — submittal
Permanent Sign — submittal
City of Alderbrook Planning Department · City of Alderbrook · v1, verified 2026-07-13 by Rosa Lindqvist
Fictional · demo
SG-01 Scaled sign elevation drawing
MandatorydocumentVerified source
Dimensions, materials and colors of each sign. · Accepts: sign_elevation
“a scaled elevation drawing of each sign showing dimensions, materials and colors”
SG-02 Sign location plan
MandatorydocumentVerified source
Site plan or building elevation showing the proposed location. · Accepts: site_plan, building_elevation
“a site plan or building elevation showing the proposed sign location”
SG-03 Property owner consent
ConditionaldocumentVerified source
Written consent for signs on leased premises. · Accepts: owner_consent
“Written consent from the property owner is required for all signs on leased premises.”
SG-04 Testing laboratory listing
ConditionaldocumentVerified source
Only for illuminated signs. Electrical permit needs must be confirmed with the Building Division. · Accepts: electrical_listing
“Illuminated signs require proof that the sign is listed by a nationally recognized testing laboratory”
Confirm this requirement directly with City of Alderbrook Planning Department before relying on it. PermitPath records what the source says; the authority decides how it applies.