Checklists / Tenant Improvement — submittal
Tenant Improvement — submittal
City of Alderbrook Building Division · City of Alderbrook · v2, verified 2026-09-01 by Rosa Lindqvist
Fictional · demo
TI-01 Construction drawings (two sets)
MandatorydocumentVerified source
Prepared and signed by a design professional licensed in Northmere. · Accepts: construction_drawings
“Submit two sets of construction drawings prepared and signed by a design professional licensed in the State of Northmere.”
TI-02 Site plan
MandatorydocumentVerified source
Identifies the tenant space. · Accepts: site_plan
“a site plan identifying the tenant space”
TI-03 Code analysis sheet
MandatorydocumentVerified source
Included with the drawing set. · Accepts: code_analysis
“a code analysis sheet”
TI-04 Contractor's state license
MandatorydocumentVerified source
Copy of the contractor's current state license. · Accepts: contractor_license
“a copy of the contractor's current state license”
TI-05 Owner authorization letter
ConditionaldocumentVerified source
Required if the applicant is not the property owner. · Accepts: owner_authorization
“a letter of authorization from the property owner if the applicant is not the owner”
TI-06 Energy compliance forms
ConditionaldocumentVerified source
For any lighting or mechanical alterations. · Accepts: energy_compliance
“completed energy compliance forms for any lighting or mechanical alterations”
TI-07 Structural calculations
ConditionaldocumentVerified source
Stamped by a licensed engineer, where structural elements are affected. · Accepts: structural_calcs
“Where the alteration affects structural elements, structural calculations stamped by a licensed engineer are required.”